• Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button

A1. HVAC Systems - Heating, Ventilation & Air Conditioning Installation of Chillers. Installation of ETS Stations - Energy Transfer Station.  Installation of Chiller Pump, Volume damper, Back draft damper and all accessories. Installation of Direct Expansion Air Conditioning Systems (Packaged Units, Ducted Splits, Mini Splits, FCUs). Fabrication & Installation of CHWS/CHWR (Chilled Water Supply/Return) line network..  Installation of Air Handling Equipment With VAV’s, CAV’s, Venturi Air Valves and Steam Humidifiers.  Fabrication & Installation of Various duct & structural units. as per line network.  Installation of CCU ( Closed Control units, Both DX And Chilled Water).  Installation of BMS – Building Management System for HVAC Control & Management.  Installation of IBMS – Integrated Building Management System to Link Different BMS Networks.  Installation of Pressurization, Exhaust & Jet Fans.  Ducting & Thermal Insulation Works 

A 2. Plumbing & Public health Systems  Installation of UPVC,CPVC , PVC Piping for Potable Water Network as per Project Specification.  Installation of PPR & PEX Piping for water supply Networks.  Installation of Water Heating Unit For Utility Network. Installation of GRP / Concrete Tanks for Portable Water Storage & Reserves. Installation of Corrugated /RTR/Cement Lining Piping for Sewage Water Network. Installation of RTR /Cement Manhole For Sewage Water Network .  Installation of Plumbing Fixtures , Sanitary Wares and Accessories as per Project Specification. Installation of Sewage Water Treatment Plants (STP, Grey Water). Installation of Pumps for Portable Water & Sewage Systems. Installation of Reverse Osmosis Plants.

A 3. Fire Fighting Systems Installation of G.I & C.S / Black Steal Piping for Fire Water Network as per Project Specification.  Installation of Hose Reel Cabinet & Fire Hydrant Network.  Installation of Deluge Fire Systems. Installation of Fire Damper and Accessories.  Installation of Fire Water & Jockey Pump Unit As Per Project Specification.  Installation of Wet / Dry Powder Fire Sprinkler System.  Installation of FM200 Systems.  Installation of Fire Extinguishers As Per Fire Fighting Network.

A .4 Testing & Commissioning for Mechanical Systems Conducting the Testing & Commissioning Process for the following Mechanical Systems:  HVAC Systems, including Chilled Water Systems & Ducting Systems .  Domestic Portable Water Supply Systems.  Irrigation & Landscaping Systems.  Fire Jockey Pump & Deluge System for Fire Fighting System.  FM200 Systems.  Sewage Water Treatment Plants (STP, Grey Water).  Medium Pressure Steam and Clean Stream Networks.  Reverse Osmosis Plants.  Water Sterilization Plants.